Permit Fees | Boring | $103.00 per parcel $ 81.00 per hour | |
CPT Boring for lithologic logging | same as above | |
Initial Monitoring Well | $103.00 per well | |
Subsequent Monitoring Well | $103.00 per well | |
Groundwater Sample | $103.00 per parcel $ 81.00 per hour | |
Vapor Extraction Well | $103.00 per well | Depending on depth of well |
Well Abandonment | $52.00 | |
Backfilling Requirements for Borings | Cement - all borings must be grouted. Must be tremie grouted if groundwater is present or location is over 30 ft in depth. |
Backfilling Requirements for Monitoring Wells | Cement |
Inspection Fees | Inspection required Fee included in permit costs |
Permit Application Information | Available on website: www.co.el-dorardo.ca.us/emd |