Permit Fees | Boring | $ 186.00 for initial boring 50.00 for additional |
CPT Boring for lithologic logging | $ 186.00 for initial boring 50.00 for additional |
Initial Monitoring Well | $ 186.00 per well |
Subsequent Monitoring Well | $ 160.00 per well |
Groundwater Sample / Hydro-Punch | $ 186.00 for initial boring 50.00 for additional |
Vapor Extraction Well | $ 186.00 for initial well $ 150.00 for additional |
Well Destruction | $ 186.00 for initial $ 120.00 for additional |
Backfilling Requirements for Borings | Please refer to California Well Standards Bulletin for specifications. |
Backfilling Requirements for Monitoring Wells | Please refer to California Well Standards Bulletin for specifications. |
Inspection Fees | yes - inspection required during and after drilling. Initial inspection fees included in permit fees. Re-inspection fees are $99.00 for 1st well & $30.00 for each additional well. |
Permit Application Information | Allow 10 working days for processing application. Please refer to SA/M manual for specifications on whether or not a soil boring requires permitting. |